High flying down in Esperance

highflyer

When the Esperance Port Authority were looking for a time saving and weight restricted access solution to assist with remedial work on the ports ship loader… they called SMS Group Services! SMS Group Services were able to save production time by assembling three 750 cubic metre craneable aluminium scaffold sections and lifting each one onto the structure when works were completed. The process was reversed again, utilising a crane to reduce down time disassembling the structure on the ground.

 Another example of SMS Group Services Initiatives helping West Australian industry .